ACUPUNCTURA PEDESTRICA ANATOLICUS
BACHELOR THESIS
FEB 2024 - DEC 2024
PART 1 - MALTEPE
PART 2 - KADIKOY
The organization of the station follows a series of stacked floors for each line of transport.
The axonometric circulation diagram needs updating, but it illustrates the concept.
1F (+8.0m) - Linear Park Access
GF (0.0m) - Station Hall and Retail
B1 (-6.0m) - Metrobus and Interchange Floor
B1.5 (-9.0m) - Parking Level 1
B2 (-12.0m) - Marmaray Platform + Parking Level 2
B3 (-18.0m) - Metro Platform
A tunnel for the Metrobus from the highway connects to the station at the -6.0m elevation. Parking is accessed via dedicated entry and exit ramps from the ground level. A stepped approach to vertical circulation allows for all passenger to reach the interchange for seamless intermodal transit between suburban rail, metro, bus rapid transit, Park and Ride (P+R) private vehicle, bicycle, and pedestrian transport. Surface level curbs allow for municipal buses, minibuses, taxis to stand at the station to pick up passengers as a stop.